Contact us

National Safe Work Month: Prioritising Safety, Every Day

  • Slide title

    Jessica Buckley, Director:


    "Safety to me is the safety of my fellow team members and contractors. Everybody has a right to work in a safe space and to ensure that, at the end of the day, they get home to loved ones. At M+J, we have made it a part of our day-to-day, so it is now just a norm. Safety Month is a great time to highlight how far we have come from where we were 18 months ago. It’s also a great time to remind each other about the 'why,' and that’s to look out for each other."


    Button

October marks National Safe Work Month, a time dedicated to raising awareness about the importance of workplace safety across Australia. At M+J Builders, safety isn't just a priority—it's at the core of everything we do. This month gives us a moment to reflect on how we incorporate safety practices into all our job sites and to celebrate the steps we take daily to ensure every team member goes home safely.



Embedding Safety into Every Job Site


At M+J Builders, safety is integrated into every phase of our projects. From initial planning to execution, we follow strict protocols and processes that ensure the well-being of all personnel. Whether it’s our team members or subcontractors, we ensure that everyone on-site understands and adheres to our safety standards. We prioritise thorough site inspections, risk assessments, and regular safety briefings that keep everyone informed and aligned with the project’s safety requirements.



  • Glen O’Brien, HSE Manager:


    ‘’Safety means we all go home to our family and friends every day. Through demonstrating genuine care and concern for our employees, subcontractors, and others' health, safety, and wellbeing who may be affected by our operations, we have an opportunity during National Safe Work Month to raise awareness of the importance of working safely and looking out for each other's wellbeing.’’


    Button


Working with Subcontractors: A Shared Commitment to Safety


Our commitment to safety extends beyond our immediate team. We collaborate closely with all our subcontractors to ensure they understand and follow the same high standards of safety we uphold. Before any project begins, we provide clear guidelines and conduct safety briefings to make sure that every individual working on our sites is fully aware of the procedures. This shared responsibility is key to maintaining a safe work environment across all our projects.





Investing in Safety: A Key to Our Success


Safety is a long-term investment at M+J Builders, and it’s one we take seriously. We regularly invest in training programs, and equipment to ensure our teams are equipped to handle the risks they may face on the job. This investment not only reduces incidents but also increases efficiency and peace of mind on-site.


Our Health, Safety, and Environment (HSE) Team plays a crucial role in overseeing the implementation of these safety measures. The HSE team is constantly reviewing our procedures, conducting audits, and ensuring compliance with industry standards and regulations. Their work ensures that safety is a dynamic and evolving aspect of our business.




  • Slide title

    Kalliopi Kalitsis, HSE Advisor:

     

    ‘’ Safety for me in M+J Builders isn’t just being safe in the workplace, it’s a value and work ethic that we have taken on as a team, to ensure that we all go home the same way we came to work, if not better. Safety at M+J is a community we have fostered for the best assurance to our staff and clients. Safety has given me, and our company more opportunities than we could have ever imagined.’’



    Button


Our Safety Procedures: More Than Just a Checklist


For us, safety is not just about checking boxes—it’s about fostering a proactive safety culture. Each job site follows a detailed safety plan, including hazard identification, risk management, and emergency preparedness protocols. We empower our team members to speak up and report potential hazards, no matter how small, ensuring that every concern is addressed before it becomes an issue.




  • Slide title

    Michael Buckley, Director: 


    ‘’As the director of M+J Builders, safety is personal for me. I started the company in 2012, and back then, safety wasn’t given the attention it deserved in the construction industry. Over the years, I’ve seen how important it is to make safety the foundation of everything we do. For me, as someone with a family, safety is about making sure that every person on our team—whether they’re in the office, on-site, or one of our subcontractors—gets home safely to their loved ones. At M+J Builders, we’re more than just a company; we’re a family, and that’s why safety is non-negotiable.’’

    Button


Celebrating Our Team’s Dedication


National Safe Work Month is a time to reflect, but it’s also a time to express gratitude to our teams who make safety a priority every day. Their vigilance, commitment, and teamwork are what make our work successful and safe. To every member of the M+J Builders team, and to our valued subcontractors, thank you for your dedication to keeping safety front and centre in everything we do.




  • Slide title

    Sonia Malady, General Manager:


    ‘’Safety First, always. For myself as a General Manager in the construction industry, safety means more than compliance, it's about protecting people, managing risks, ensuring productivity, and building trust. From legal standards to fostering a safety-first culture, it’s the foundation of sustainable success. Safe teams = Strong projects.’’


    Button


Moving Forward: Safety First



As we continue to grow and take on new projects, our focus will always remain on safety first. Because at the end of the day, no job is more important than the health and safety of our people.


  • Slide title

    Zac Garrett, Construction Manager:


    ‘’Safety means that we all get home safely after every day of work. That is a right. M+J Builders are continuing to implement new strategies and procedures through the delivery of our projects to ensure we comply with regulations. This approach is continued through the office, and there is genuine care from the leaders of the team to ensure our employees and subbies are well outside of work. While we continue to learn, we may not necessarily change what we do in everyday life, but I think it gives us the opportunity to be more aware of situations and outcomes. This is a great time to reflect on our journey and to look into the future to further develop. While we don’t generally give too much consideration to safety and how it affects our lives, it is extremely important, and if we get it wrong, the effects could be devastating.’’


    Button
  • Slide title

    Brooke Burns, HSE Advisor: 


    "Safety has been the foundation of my journey in construction. As an HSE advisor, it’s not just about following rules—it’s about protecting lives and creating a culture where everyone feels confident, they’ll go home safe at the end of the day. At M+J Builders, safety is more than a checklist; it’s the heart of how we operate, from the ground up. We’ve built a culture of accountability and care, where every project is an opportunity to reinforce that safety comes first."


    Button
December 18, 2024
The recent completion of the KFC in Stuart Park highlights our ability to meet the demands of a high-profile franchise while maintaining a focus on quality and efficiency. The Project Situated at 43 Stuart Highway, next to Sweet Brew Café, the new KFC Stuart Park stands on a site that was once a vacant single allotment. We transformed the unused land into a fully operational restaurant designed to meet KFC’s strict global specifications. The project was completed on time, and the restaurant opened its doors in November 2024. Key Achievements Franchise Standards: Meeting KFC’s global requirements, we ensured every detail—from kitchen equipment to interior finishes—aligned with their brand identity. Efficient Design: The layout was optimised for high-volume service, durability, and operational efficiency. Local Impact: The project created 50 new jobs, contributing to the economic growth of the Darwin community. Why M+J Builders? We specialise in delivering complex commercial projects. Whether it’s a national brand or a bespoke development, we bring the same level of dedication to every build.
December 18, 2024
Cullen Bay has always been a favourite spot for locals and visitors, offering a laid-back, tropical waterside lifestyle just moments from Darwin’s CBD. Recently, the precinct has undergone a revitalisation aimed at strengthening the connection between the beachfront and marina, while enhancing the area’s appeal with new greening and cooling initiatives. Role in the Revitalisation As part of the Cullen Bay revitalisation project, M+J Builders played a key role in transforming the precinct into a more vibrant, accessible space: Shade Structures: We installed three new shade structures around the marina, providing much-needed relief from the harsh tropical sun and creating spaces for visitors to relax in comfort. Seating & Gathering Spaces: Our team worked on installing informal seating areas, paving, and concrete works, plus arbours over shops to create inviting spots for social interaction and relaxation. Artistic Lighting: To bring the precinct to life at night, we added lighting that creates stunning art effects, making the space a lively destination after dark. Accessibility Improvements: We made sure that Cullen Bay is accessible to everyone by building pathways for disabled access to the beach and gardens. Overcoming Challenges This project came with its share of challenges, including managing pedestrian traffic, navigating council property constraints, and coordinating works around busy roads and local businesses. With careful planning and execution, our team ensured the area remained accessible throughout the process, minimising disruptions to the public as the site always has high numbers of foot traffic. A Collaborative Effort The revitalisation was a joint effort led by the Northern Territory Government and Cullen Bay Marina Management Corporation, with funding and oversight focused on creating cooler, more attractive spaces that would draw both locals and tourists. The goal was to improve liveability and bring more visitors to this prime location in Darwin. Experience the New Cullen Bay Cullen Bay now features a refreshed streetscape with shade trees, lawns, and tropical plants, making it a much cooler and inviting place. The improvements not only enhance the look and feel of the area but also support local businesses by encouraging more foot traffic. We invite you to visit Cullen Bay and see the transformations for yourself. Whether you’re relaxing by the water, dining at one of the local cafes, or soaking in the vibrant atmosphere, Cullen Bay offers something for everyone. At M+J Builders, we’re proud to have contributed to this exciting project and helped make Cullen Bay an even more special place. 
December 12, 2024
Sustainability has become a cornerstone of modern construction, serving as a vital component in building structures in harmony with our environment. As a Darwin based construction company, where our tropical climate presents unique challenges, sustainable building practices are a core part of how we deliver projects that stand the test of time. Designing for the tropics Building in Darwin’s tropical climate means more than just making durable structures. It’s about designing buildings that are adaptable to the intense heat, humidity, and heavy rainfall. Sustainable designs incorporate features that mitigate the environmental impact while keeping operational costs down for residents and businesses. Passive cooling solutions: One of the key elements of sustainable construction in the tropics is minimising energy consumption through natural cooling techniques. Large overhangs, ventilated roofs, and shaded windows help reduce the need for artificial cooling. In Darwin, well-designed ventilation allows buildings to harness the breezes while minimising the use of air conditioning, reducing energy costs. Sustainable materials Using locally sourced and env Indigenousironmentally friendly materials is crucial in tropical environments. It not only reduces transportation emissions but also ensures the building materials are suitable for local conditions. These materials can include: ● Treated timber from renewable sources, which is both durable and effective in the wet-dry tropical cycle. For example, we’ve used Gumatj timber on various projects, from a local NT owned mill. ● Recycled materials like steel or concrete can lower the carbon footprint of the construction process while maintaining structural integrity. ● Bamboo as a fast-growing and strong alternative to traditional hardwoods, we use bamboo for decorative finishings. ● Cool roofing materials, such as reflective tiles or metal roofing, which deflect sunlight and reduce heat absorption, helping to lower indoor temperatures in tropical areas. Energy efficiency in construction Energy efficiency is a pillar of sustainable building. Implementing solar panels, energy-efficient lighting, and smart building systems can significantly reduce the overall energy consumption of a structure. In Darwin, where sunlight is abundant, solar energy is a natural choice. Projects that embrace solar solutions help reduce the reliance on non-renewable energy, making buildings more resilient to both environmental and economic challenges. Water management Given the heavy rainfall in Darwin’s wet season, effective water management systems are crucial. Sustainable buildings feature rainwater harvesting systems and permeable paving to manage stormwater runoff, preventing floods while providing an alternative water source during the dry season. Building for longevity A sustainable building is one that lasts. Durability is key when facing Darwin’s harsh weather conditions, from tropical cyclones to extreme humidity. At M+J Builders, we focus on using high-quality materials and construction methods that ensure our projects withstand the challenges of a tropical climate while requiring minimal maintenance. Case study: Somerville Palmerston and Katherine M+J Builders constructed 7 houses for high dependency occupants in Palmerston and Katherine. Here’s some key features that made this project energy efficient and sustainable. Energy efficiency: These homes were rated 7.4 in energy efficiency. Features included: ● High venting ceiling with high level louvre windows to allow ventilation ● Venting roofs ● Shading wall classing of masonry over windows around the property ● Breeze corridor with louvres throughout hallways ● Breeze corridor with both homes opening onto deck ● Natural light into the centre of the building ● Solar/PV panels with 2 hour battery backup power for vulnerable tenants to use in an emergency Water efficiency: We upgraded showers, taps and appliances to maximise water efficiency throughout the homes which transferred water usage from approximately 25L a minute to 4.5L a minute for each fixture. Resource efficiency: ● Locally sourced Gumatj timber though an Indigenous supplier in the NT ● Maintained a waste register throughout the build which documented the split between recycled materials and waste materials ● Donated off-cuts of timber, steel and iron to HPA - Helping People Achieve, a disability service.
By Jessica Buckley October 23, 2024
M+J Builders recently upgraded the HVAC system at Darwin International Airport. The existing air-cooled chillers were nearing the end of their end of life, prompting the construction of a new Eastern Chiller Plant.
October 4, 2024
Find out why quality materials are so important to us at M+J Builders.
June 24, 2024
M+J Builders collaborated with DJK architects to undertake a luxury renovation on the top-floor apartment of the Mantra Pandanas building, in the heart of Darwin's CBD.
December 7, 2023
In collaboration with Turner & Townsend and West Daly Regional Council, we recently had the privilege of refurbishing the Wadeye community pool.
November 30, 2023
Bringing home five awards for three of our favourite projects 
September 17, 2023
In the heart of Cullen Bay, we took this Marina Boulevard apartment through a drastic transformation.
September 16, 2023
M+J Builders were thrilled to win three awards at the Master Builders Excellence in Building & Construction Awards.
More Posts
Share by: